Solutions
Horse Construction offers full range of structural strengthening materials with technical supports, documentation supports, products supports, project supports.
Repair Of Damage With Exposed Steel Reinforcement
solution for repairing corroded ceiling?
1. Concrete steel bars are prone to rust when exposed, so before repairing, we can use rust removers to remove the rust on the exposed steel bars on the surface of the concrete.
2. Remove the loose concrete on the surface until the base is hard and firm.
3. We use a high-pressure water gun to wash the concrete clean. The concrete should be kept moist but there should be no open water on the surface.
4. Fill the prepared cement mortar into the exposed reinforcement and compact and smooth it. Before the final setting of the cement, it should be leveled and polished.
5. Sprinkle water on the repaired area for maintenance, with a general maintenance time of 7 days.
6. If there are too many exposed steel bars in the concrete, it will affect the quality of the concrete. Everyone can chisel off the concrete and re cast the formwork to repair it.
After repair, carbon fiber plate and carbon fiber sheet can be pasted to increase strength. Like this project
You can find anything here you are in need of, have a trust trying on these products, you will find the big difference after that.
High strength, unidirectional carbon fiber wrap pre-saturated to form a carbon fiber reinforced polymer (CFRP) wrap used to strengthen structural concrete elements.
High strength carbon fiber reinforced polymer (CFRP) strip / laminate / plate for structural strengthening and concrete repair
High strength, unidirectional carbon fiber fabric pre-saturated to form a carbon fiber reinforced polymer (CFRP) fabric used to strengthen structural concrete elements.